Engineer to order

Maskinanlæg

Do you produce machines or facilities?

Does your company work in a project-oriented manner? MW data has a great deal of experience in this type of company and has developed an industry solution with all the functions needed to optimize the critical processes. It gives you an efficient flow and a full overview throughout the project, enabling flexibility and modifications during the entire process.

Microsoft has selected MW data as a Preferred Partner for delivering industry solutions to engineer to order (ETO) manufacturers.

Do these challenges seem familiar...

Issues we often see with companies in machine or facility production may include:

  • Simple handling of complex projects with unique production implies working around the production module in order to create products and bills of materials (BOMs) when it makes sense. 
  • Precise handling of plan modifications is necessary to make sure that it is always the updated versions that are available to the production. This minimizes the risk of errors and waiting time.
  • Current work must be easy to estimate, including precise calculations of the degree to which the project is completed.
  • Packing lists must be worked out per package to optimize both the preparation of the shipment and the assembly.  
  • Overview, precise milestone control and optimized workflow are crucial factors in deciding whether the project is completed on time.
  • BOMs must be changeable and flexible, even late into the process, so as to achieve a shorter production time with the option to release component parts along the way.
  • An overview of the total project economy, continuously learning from experience and optimizing planning, also when dealing with upcoming projects, is necessary to ensure profitable production.
  • Partial release with the realized BOM at particular levels being released for production and purchase must be possible in order to reduce turnaround time.
  • Technical specifications attached to subjects or facilities are often necessary to ensure that non-product dependent demands are defined for the production and the vendors.
  • To have complete control of producing a facility necessitates a perfect view of all subprocesses in the project.
  • The wish of making the products flexible and configurable makes demands that all relevant questions are answered.

We have the solution

With the "Maskin og Anlæg til Dynamics AX" module combined with MW data's extensive experience with companies in the engineering and construction industry, you will be provided with the optimum solution for optimizing central processes in your company throughout the project - from quotations, development, and design activities to execution, delivery and assembly as well as subsequent handling of warranty and service.

Learn more about how you gain control of the critical parameters in the fields of:

Contact consultant

Bo Krogh Knudsen
System Architect
Tel:+45 70 205 205
Mobile:+45 50 982 526
Email:bkk@mwdata.dk

References

Hamworthy Svanehøj
Hamworthy Svanehøj achieved significant time and operating cost savings with an MW industry solution

Product

Microsoft Dynamics AX 2012
Watch video demonstrations or try for yourself how easy it is to work in Microsoft Dynamics AX 2012.

Free value analysis

We calculate, on the basis of your current numbers and needs, how a Microsoft Dynamics AX solution can actually improve your business.

Signup for newsletter